VadeLab
AllowedFirst-tier Tribunal (Property Chamber)·

First-tier Tribunal Grants Dispensation for Urgent Roof Repairs

Case No.

📌 In brief

The First-tier Tribunal granted permission to a landlord to bypass consultation requirements for urgent roof repairs, as no harm was found to have been caused to the tenants.

⚖️ Legal holding

A landlord may be dispensed from consultation requirements if the works are urgent and no prejudice is suffered by the tenants.

Topics

tenancy disputesroof repairsconsultation requirements

Provisions

Landlord and Tenant Act 1985 s.20ZATribunal Procedure Rules 2013 rule 31

📖 What the law says

Landlord and Tenant Act 1985 s.20ZA

The Act allows a tribunal to grant dispensation from consultation requirements if it is reasonable to do so. The consultation requirements refer to obligations placed on landlords to consult tenants regarding proposed works or agreements.

Plain-English explanation — does not replace advice from a solicitor.

📖 Technical summary

The Tribunal granted dispensation from the consultation requirements for urgent roof repairs.

📜 Headnote Official document

The Tribunal granted dispensation from the consultation requirements for urgent roof repairs, finding no evidence of prejudice to the tenants.

📚 Full judgment Official document

OUTCOME: Allowed

© CROWN COPYRIGHT

FIRST-TIER TRIBUNAL PROPERTY CHAMBER (RESIDENTIAL PROPERTY)

Case Reference

:

CHI/23UB/LDC/2022/0073

Property

:

[ADDRESS], [POSTCODE]

Applicant: [redacted]

:

[COMPANY]

Respondents

:

[redacted] [COUNSEL] [NAME] (Flat 10)

Representative

:

Type of Application

:

To dispense with the requirement to consult [NAME] about major works section 20ZA of the Landlord and Tenant Act 1985

Tribunal member

:

[NAME] of Decision

:

1 September 2022

DECISION

The Tribunal grants dispensation from the consultation requirements of S.20 Landlord and Tenant Act 1985 in respect of the repairs to the roof carried out by [COMPANY].

In granting dispensation, the Tribunal makes no determination as to whether any service charge costs are reasonable or payable.

The Applicant is to send a copy of this determination to all of the [NAME] liable to contribute to service charges.

2 Background

1. The Applicant seeks dispensation under Section 20ZA of the Landlord and Tenant Act 1985 from the consultation requirements imposed on the landlord by Section 20 of the 1985 Act. The application was received on 1 August 2022.

2. The property is described as a purpose built 5-storey building of 10 flats with the following features: Flat roof, Small courtyard at the left hand side with steps leading to the rear car parking area, Main entrance door at the front and additionally a car park at the frontage.

3.

The Applicant explains that “An area of roof above 8 The Glass House was found to be defective and temporary repairs to it were not possible due to it being constructed from a liquid membrane and multiple small defects being present. High level coping stone repairs were carried out near the defective area in May 2022, however this issue, relating to the roof covering was not identified until recently.” and further “These works were of an urgent nature due to the amount of water that was entering property 8. Works commenced 13th July 2022 and were completed 15th July 2022. These works were carried out urgently to mitigate further damage to the apartment and fabric of the building.”

4.

The Applicant confirms that no consultation has been carried out due to the urgency of the works.

5.

Copies of estimates have been provided with the application for [NAME] (Cheltenham) [COMPANY] and [COMPANY].

6.

The dispensation sought is for work undertaken by [NAME] at a cost of £3,936 inc VAT.

7. The Tribunal made Directions on 4 August 2022 indicating that it considered that the application was suitable to be determined on the papers without a hearing in accordance with Rule 31 of the Tribunal Procedure Rules 2013 unless a party objected.

8. The Tribunal required the Applicant to send its Directions to the parties together with a form for the [NAME] to indicate to the Tribunal whether they agreed with or opposed the application and whether they requested an oral hearing. Those [NAME] who agreed with the application or failed to return the form would be removed as Respondents. On 9 August 2022 the Applicant confirmed that the Tribunal’s Directions had been served as required.

9. [NAME] responded five of whom initially agreed with the application although one subsequently sent an email raising

3 objections. The four [NAME] in agreement have been removed as Respondents as referred to above.

10. No requests for an oral hearing were made and the matter is therefore determined on the papers in accordance with Rule 31 of the Tribunal’s Procedural Rules.

11. Before making this determination, the papers received were examined to determine whether the issues remained capable of determination without an oral hearing and it was decided that they were, given that the application remained unchallenged.

The Law

12. The relevant section of the Act reads as follows:

S.20 ZA Consultation requirements: Where an application is made to a Leasehold Valuation Tribunal for a determination to dispense with all or any of the consultation requirements in relation to any qualifying works or qualifying long-term agreement, the Tribunal may make the determination if satisfied that it is reasonable to dispense with the requirements.

13. The matter was examined in some detail by the Supreme Court in the case of [COMPANY] v Benson. In summary the Supreme Court noted the following; a. The main question for the Tribunal when considering how to exercise its jurisdiction in accordance with section 20ZA is the real prejudice to the tenants flowing from the landlord’s breach of the consultation requirements.

b. The financial consequence to the landlord of not granting a dispensation is not a relevant factor. The nature of the landlord is not a relevant factor.

c. Dispensation should not be refused solely because the landlord seriously breached, or departed from, the consultation requirements. d. The Tribunal has power to grant a dispensation as it thinks fit, provided that any terms are appropriate.

e. The Tribunal has power to impose a condition that the landlord pays the tenants’ reasonable costs (including [NAME] and/or legal fees) incurred in connection with the landlord’s application under section 20ZA (1).

f. The legal burden of proof in relation to dispensation applications is on the landlord. The factual burden of identifying some “relevant” prejudice that they would or might have suffered is on the tenants.

4

g. The court considered that “relevant” prejudice should be given a narrow definition; it means whether non-compliance with the consultation requirements has led the landlord to incur costs in an unreasonable amount or to incur them in the provision of services, or in the carrying out of works, which fell below a reasonable standard, in other words whether the non- compliance has in that sense caused prejudice to the tenant.

h. The more serious and/or deliberate the landlord's failure, the more readily a Tribunal would be likely to accept that the tenants had suffered prejudice.

i. Once the tenants had shown a credible case for prejudice, the Tribunal should look to the landlord to rebut it.

Evidence

14. In accordance with the Tribunal’s directions the Applicant has provided a hearing bundle containing the evidence required for the Tribunal to determine the matter. Reference to page numbers in the bundle are contained in square brackets.

Applicant

15. In support of the background information contained in paragraphs 2 to 6 above copies of two estimates are provided, [NAME] [17] and [NAME] [18] together with a report from [NAME] detailing the repairs required [19].

16. In a Statement of Case [79] the Applicant explains that there have been significant maintenance and repair issues at the premises relating to water ingress affecting the apartments. Following S.20 consultations they carried out works to the coping stones earlier in 2022 the works being completed in May, carried out by [NAME] and managed by [NAME].

17. Following completion of these works Flat 8 reported water ingress into another part of the flat which on inspection revealed pinholes in the body of the liquid roof system. [NAME] surveyors inspected and advised on a remedy following which estimates were obtained from two contractors, the lower being from [NAME] which was accepted.

18. [NAME] were able to use the scaffolding already erected for the previous job giving an approximate saving of £1,500.

Respondents

19. Ms [NAME] submitted a reply to the Tribunal objecting to the Application on the grounds of;

5 • Roof repairs have been going on for years at a huge cost • The roof has been thoroughly surveyed and works undertaken • How was this work missed? • Shouldn’t have been done as emergency works as should have been known from the earlier survey • In a drought situation so water ingress could not have been urgent

20. Mr [NAME], who initially replied to the Tribunal that he agreed with the Application subsequently objected and raised the following; • He has been in dispute with [NAME] over repair costs for a number of years. • None of the demands complied with Section 20 procedures. • Money for work carried out in July 2022 was demanded in November 2021.

Applicant’s reply

21. In reply the Applicant says that; • The works are to a different part of the building as per section 3.5 of the [NAME]’s report. • Photos show the water ingress and a weather report indicate that there was rainfall in May [87, 89] • Two estimates were obtained ensuring value for money and to prevent further damage to the building. • The leading case of [COMPANY] v Benson [2013] is relevant (see further details at paragraph 13 above) • Long term reserves are insufficient to pay for section 20 major works • [NAME] were invited to a meeting to discuss on 23 February 2022 prior to which a detailed letter was sent to all [NAME] but only the [NAME] of [NAME] attended • The freeholders turned down a loan request, but [NAME] were able to negotiate a 6 month staged payment facility with the contractor • The money demanded in November 2021 was for the works to the coping stones, not the current works

Determination

22. Dispensation from the consultation requirements of S.20 of the Act may be given where the Tribunal is satisfied that it is reasonable to dispense with those requirements. Guidance on how such power may be exercised is provided by the leading case of Daejan v Benson referred to above.

23. The guidance of the Daejan case referred to above is that the [NAME] must demonstrate that they have suffered some “prejudice” by not

6 being consulted. It is not a pre-requisite that the works are urgent although this factor may have some relevance as to whether competitive tenders have been obtained. In this case two quotations were received and the rights that the [NAME] have “lost” are that of having greater notice of the expenditure, of nominating a contractor and commenting on the works proposed.

24. It is not helpful that the Applicant’s reference to section 3.5 of the [NAME]’s report cannot be identified, there being no numbering to the paragraphs in the report dated 14 June 2022[22]. Neither is it possible to determine whether or not this is the same roof that was subject to the repairs described as the replacement of the coping stones and completed earlier this year. The earlier specification refers to Flats 8 & 10 and this current application refers to Flat 10.

25. The consultation documents do however refer solely to works to the coping stones whereas these works are to the roof membrane. This is not however a matter that the Tribunal need to determine in considering the question of dispensation.

26. Whether or not these works should have been identified earlier is not an issue in determining whether prejudice has been suffered the sole question being for the Tribunal being, once they were identified did the [NAME] suffer prejudice by not being consulted over how they were to be repaired.

27. In this case competitive tenders were obtained and by using the scaffolding still I place from the previous works the cost of striking and re-erecting the same was avoided.

28. In view of the above I am not satisfied that the Respondents have provided convincing evidence that they have suffered the type of prejudice as referred to in the Daejan case previously referred t.

29. The Tribunal therefore grants dispensation from the consultation requirements of S.20 Landlord and Tenant Act 1985 in respect of the repairs to the roof carried out by [COMPANY].

30. In granting dispensation, the Tribunal makes no determination as to whether any service charge costs are reasonable or payable.

31. The Applicant is to send a copy of this determination to all of the [NAME] liable to contribute to service charges.

D [NAME] [NAME] 1 September 2022

7 RIGHTS OF APPEAL

1. A person wishing to appeal this decision to the Upper Tribunal (Lands Chamber) must seek permission to do so by making written application by email to [EMAIL] to the First-tier Tribunal at the [NAME] which has been dealing with the case.

2. The application must arrive at the Tribunal within 28 days after the Tribunal sends to the person making the application written reasons for the decision.

3. If the person wishing to appeal does not comply with the 28 day time limit, the person shall include with the application for permission to appeal a request for an extension of time and the reason for not complying with the 28 day time limit; the Tribunal will then decide whether to extend time or not to allow the application for permission to appeal to proceed.

4. The application for permission to appeal must identify the decision of the Tribunal to which it relates, state the grounds of appeal, and state the result the party making the application is seeking.

📊 How courts decide similar cases

Among 12 similar decisions in this collection:

A snapshot of this collection — not a prediction of your case's outcome.

⚖️ What tends to weigh in cases like this

✅ Tends to be accepted

  • The works are considered urgent.
  • No prejudice is suffered by the tenants.
  • The works cannot wait for consultation procedures.
  • There is no relevant prejudice to the leaseholders.
  • No consultation prejudice is found.

Patterns observed in similar cases in this collection — every case is unique.

❓ Frequently asked questions

What did this decision decide?

The Tribunal allowed the landlord to bypass consultation requirements for urgent roof repairs.

Who was involved?

The landlord and the tenants of a multi-story building were involved.

How did the court decide, and why?

The court decided that the landlord could bypass the consultation requirements because the works were urgent and no prejudice was suffered by the tenants.

Which laws or rules were applied?

The Landlord and Tenant Act 1985 s.20ZA and the Tribunal Procedure Rules 2013 rule 31 were applied.

What was the argument that mattered most?

The argument that mattered most was that the works were urgent and no prejudice was suffered by the tenants.

Was the decision for or against the person who brought the case?

The decision was for the landlord who brought the case.

What does this mean for someone in a similar situation?

Someone in a similar situation may also be granted dispensation if their works are urgent and no prejudice is suffered by the tenants.

What evidence or documents mattered?

Estimates from contractors and reports from surveyors were important pieces of evidence.

Can a decision like this be appealed?

Yes, a decision like this can be appealed to the Upper Tribunal (Lands Chamber).

Is it worth getting a solicitor for a case like this?

It is always recommended to get advice from a qualified solicitor for a case like this.

Official source: First-tier Tribunal (Property Chamber) headnote and full judgment reproduced from the court's public records. View on the official source ↗Summary, holding, technical summary and questions: produced by Artificial Intelligence based on the official headnote and judgment. These are VadeLab’s own material and are not the work of the Court.This decision was issued by the First-tier Tribunal (Property Chamber) and is reproduced from its published records. VadeLab is not affiliated with, and this page is not endorsed by, that court or tribunal.